Baltimore, MD

Completed 2012


Carroll Engineering has been completing projects at Oriole Park at Camden Yards for more than 15 years, including seating renovations and designs for the new rooftop bar and Hall of Famer’s Courtyard, unveiled in 2012.  CEI has also provided structural designs for the replacement of four stadium escalators, and we are currently conducting a facilities assessment of the entire Camden Yards Complex.

In 2009, CEI provided civil and structural designs for seating upgrades and dugout renovations at the park.  The project replaced 48,000 seats and corrected poor drainage in both dugouts, which experienced flooding during heavy storm events.  CEI increased surface drain area in the dugouts and provided seating upgrades, including seat-widening, water-proofing, and repair of surface deterioration.

MSA undertook another major renovation project in 2011 to construct the stadium’s new rooftop bar and Hall of Famer’s Courtyard. The project involved civil and structural designs to expand the existing open-air concession space.  Our civil team reconfigured the entire picnic area and plaza, providing full stormwater management and erosion/sediment control plans.  Structural designs included masonry and steel framing to support the addition, as well as a 1,500-SF steel canopy to cover the bar area.  Specialized designs were also required for installation of the six 1,000-pound statues.


SU Stadium

M & T Bank Stadium

Oriole Park at Camden Yards

Redskins Training Facility


ATHLETIC & STADIUM


Oriole Park at Camden Yards Renovations